Suunto app Forum Suunto Community Forum
    • Recent
    • Tags
    • Popular
    • Users
    • Groups
    • Register
    • Login

    Period of training plan on Spartan ultra

    Scheduled Pinned Locked Moved Spartan
    4 Posts 2 Posters 264 Views 2 Watching
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • FPV CZF Offline
      FPV CZ
      last edited by

      Hello,

      I would like to know if is possible to change the period of Training plan. I mean not from Monday to Sunday but 7 days, to actual day from 7 days before as is saw for the Steps or calory.

      Thank you

      AlexCapture1.JPG Capture.JPG

      1 Reply Last reply Reply Quote 0
      • FPV CZF Offline
        FPV CZ
        last edited by

        Somebody know about this ?

        Mff73M 1 Reply Last reply Reply Quote 0
        • FPV CZF Offline
          FPV CZ
          last edited by

          I mean to adjust for the last 7 days as on application.

          Capture.JPG

          1 Reply Last reply Reply Quote 0
          • Mff73M Offline
            Mff73 @FPV CZ
            last edited by

            @fpv-cz
            I don’t think it is possible.

            Suunto Spartan Ultra (since 2016) FW: 2.8.24 (retired)
            Suunto Vertical all black
            Wife : S9PP
            SA: Always the latest beta :)
            Android 13, Galaxy S205G

            1 Reply Last reply Reply Quote 1
            • First post
              Last post

            Suunto Terms | Privacy Policy